Civil Lab Tools / Soil Testing / MDD & OMC
Proctor Compaction — MDD & OMC
Enter the test information and mould details once, then add each compaction point. Results are read at the top of a smooth curve through all measured points.
1. Test information
2. Mould information
Wet density = Wet soil mass ÷ Mould volume
Dry density = Wet density ÷ (1 + moisture content ÷ 100)
3. Compaction test points
Use grams for all masses and cm³ for mould volume. Each point needs one compacted mould specimen and one moisture sample from it.
Enter mould details and a test point to begin.
4. Test results
| Test | Water added (%) | Wet density (g/cm³) | Moisture content (%) | Dry density (g/cm³) | Action |
|---|---|---|---|---|---|
| No test points added yet. | |||||
Results will appear after calculating five valid test points.
5. Compaction curve
Dry density is plotted against moisture content. A smooth curve passes through every measured point (orange dots). MDD and OMC are read at the top of this curve (red dot), which can lie between points, and not simply at the highest measured dry density.
FOR CONTRACTOR
Checked by (MT):
Signature: ______________________________
Date:
FOR ENGINEER
Verified by (ME):
Signature: ______________________________
Date: