Civil Lab Tools / Soil Testing / CBR

Soil Testing

California Bearing Ratio — CBR

Record the three CBR test points, soaked moisture and swell, then enter the penetration readings. CBR at 2.5 mm and 5.0 mm, the logarithmic trend and CBR at 95% MDD update as you type.

1. Test information

2. Compaction targets and equipment

Water to add for OMC = (OMC − NMC) × initial sample mass ÷ (100 + NMC).

The three CBR moulds normally use 2305 cm³. Use the target MDD, OMC and NMC determined from the compaction sheet for the same material.

3. CBR test points

Enter masses in grams. Pre-compaction moisture is used for the dry density; the after-soaking moisture is reported separately. Use one row per test (A, B and C).

ParameterTest ATest BTest C

4. Penetration readings

Enter the dial gauge reading at each penetration. Force = dial reading × proving ring factor. CBR at 2.5 mm = force ÷ 13.2 × 100; CBR at 5.0 mm = force ÷ 20 × 100.

Penetration (mm) Test A
Test B
Test C
DialForce (kN)DialForce (kN)DialForce (kN)
Force (kN) = dial reading × proving ring factor. The CBR values are calculated at exactly 2.5 mm and 5.0 mm.

5. CBR results

CBR at 95% MDD
—
%
95% MDD dry density
—
kg/m³
Water to add for OMC
—
ml per test

Enter the target MDD, proving ring factor and test data. Results update as you type.

Enter at least two valid CBR points to fit a logarithmic trend.
Compaction (% MDD)Dry density (kg/m³)CBR (%)

The trend is CBR = a × ln(dry density) + b. It is fitted from the measured CBR points by least squares; enter a and b to use a project-specific design curve.

6. Charts

Force–penetration, CBR–density, CBR–compaction and swell–compaction charts are redrawn from the current sheet. Print in colour or save as PDF.

Force vs plunger penetration

CBR vs dry density

CBR vs compaction

Swell vs compaction

PREPARED BY

Name:

Signature: ______________________________

Date:

Assistant Materials Technician

CHECKED BY

Name:

Signature: ______________________________

Date:

Consultant's Materials Technician

VERIFIED BY

Name:

Signature: ______________________________

Date:

Consultant's Materials Engineer

Engineering note: CBR is calculated at 2.5 mm and 5.0 mm from the proving-ring force. The 95% MDD value is read from a logarithmic trend fitted to the measured CBR points, not from a single mould. If the 5.0 mm CBR is higher than the 2.5 mm value, check the test and the project specification before reporting. Confirm the compaction method, soaking period, proving-ring calibration, moisture determination and reporting requirements against BS 1377 or the project specification. This tool does not determine acceptance or replace engineering review.